Contact:
Dipl.-Geoök. S. Müller
Dipl.-Phys. T. Twardzik
The site quality after commissioning applies to all wind turbines whose level of remuneration was determined via the tendering process.
This corresponds to the ratio of the site yield to the reference yield of a wind turbine and is to be determined according to the EEG after 5, 10 and 15 years of operation.
PROCEDURE
WIND-consult offers the analysis of the operating data and the determination of the site quality according to the FGW-TR10.
The wind turbine SCADA data are processed according to a predefined procedure, so that the site yield according to the EEG is determined taking into account categorized operating conditions.
As an accredited measuring institute, we are a member of FGW’s expert committee on operating data and site quality and were involved in the development of the TR10 and the design of the interlaboratory test.